Transformers, turbines, and high-voltage gear now set project timelines as much as interconnection does. Solmar sources and places long-lead power equipment through the same confidential process behind its asset platform.
Long-lead equipment defines feasibility. Transformer deliveries run past two years and turbine reservations are booking years ahead. Access decides the schedule.
Turbine packages, gas generators, and reciprocating engines for prime and bridge power, matched to project timelines and fuel pathways.
Large power transformers, substation gear, and high-voltage equipment. The longest-lead items on most schedules, and the first ones worth securing.
Medium and low-voltage switchgear, protection, and distribution equipment that carries a site from energization through buildout.
Fuel cells, backup generation, and resiliency equipment for large-load users that cannot wait on the grid.
BESS for capacity, bridging, and grid services, sized to the project rather than the catalog.
Interim generation that energizes a site while permanent interconnection catches up. Speed to power is a development question. This is part of the answer.
The desk connects buyer needs with seller availability and strategic partners under confidentiality, screened with the same discipline as every asset on the platform.